⚡ Los Angeles EV Charging Specialists

Power Up
Your Property
Today

Licensed EV charger installation for homes, apartments, and commercial properties across Greater LA. Permitted. Warrantied. SCE Charge Ready partner for multi-family, commercial & public sector.

500+
Installs Done
4.9★
Google Rating
$3,500
Max L2 Rebate/Port
$40.2K
Max DCFC Rebate
GET A FREE QUOTE
Response within 24 hours. No pressure.
🔒 Private & secure · CSLB #536230
✅ Thanks! We'll call you within 24 hours.
🏛️ CSLB #536230 Licensed
EVITP Certified
📋 Permits Every Job
💚 SCE Charge Ready Partner
🔩 SCE Rebate Specialists
🔧 5-Year Warranty
Residential EV Level 2 charger installation in home garage
Residential Level 2 Installation
EV charging stations in commercial parking lot for business
Commercial Parking Lot Deploy
Electrician installing EV charger with panel upgrade
Licensed Installation Crew
What We Install

Every EV Charging
Need, Covered

From single home chargers to large-scale DCFC deployments — we handle everything from permit to final inspection.

🏠
RESIDENTIAL LEVEL 2
240V dedicated circuit and wall charger. Charge your Tesla, Rivian, Ford, or GM overnight. Permit, breaker, and wire run included. Most jobs done in one day.
From $899 installed →
🏢
COMMERCIAL LEVEL 2
Apartments, offices, and retail. Scalable networked infrastructure with smart load management. We handle CALGreen compliance and SCE rebate applications.
Free site assessment →
DC FAST CHARGING (DCFC)
Level 3 fast chargers for retail centers, hotels & commercial sites. SCE covers utility-side infrastructure — rebate covers up to 80% of your total project cost. Up to $40,200 per port.
Up to $40,200 rebate →
🔌
PANEL UPGRADES
Older LA properties often need a 200A service upgrade before EV charging. We manage the full upgrade, LADWP coordination, and dedicated EV circuit.
Bundled pricing →
🏛️
PUBLIC SECTOR SITES
Government buildings, municipalities, school districts. SCE Charge Ready program-funded infrastructure and exclusive TOU rate plans available for public sector.
Show community leadership →
🚛
EV FLEET CHARGING
Turnkey depot charging for 2 to 200 vehicles. Smart energy management, demand response enrollment, and full SCE fleet program navigation.
Fleet assessment →
SCE Charge Ready — Multi-Family

Up to $3,500 Per Port
for Developers

SCE's New Construction Rebate is designed for multi-family residential developers installing EV chargers that exceed CALGreen code. We file your application, handle the install, and submit all documentation.

Multi-Family NCR Program

The NCR program bridges the gap between what CALGreen requires and fully operational charging stations — covering costs that go above code requirements.

NEW CONSTRUCTION REBATE (NCR)
Up to $3,500 per port for newly built multi-family properties (2+ units, COO after 1/1/2017). Covers equipment purchase, installation, and qualifying infrastructure above CALGreen. Must apply before any equipment is ordered.
Multi-family new construction →
SMALL SITE REBATE
For multi-family, public sector, and commercial properties. Direct rebate to offset purchase and installation of qualified Level 2 EV charging stations. Streamlined application for smaller or existing sites.
Existing properties →
TURN-KEY INSTALLATION (DACs)
Exclusively for multi-family properties in Disadvantaged Communities. SCE installs at minimal or no cost. We verify if your property qualifies via CalEnviroScreen.
Disadvantaged communities →

WE HANDLE THE APPLICATION

Coal Pods files the SCE reservation, sources APL equipment, and submits every incentive document.

Start My Rebate →
NCR Key Numbers
$3,500
Max Per Port
Equipment + install. Cannot exceed actual costs.
L2 Only
Equipment Type
Networked Level 2, ≤ 40A, from SCE Approved Product List
10 Yrs
Commitment
Must operate equipment in good working order
80%
Infra Cost Covered
SCE rebates up to 80% of estimated customer-side infrastructure costs

Example: 100-space property installs 10 L2 ports → up to $35,000. Add 5 more above code → up to $52,500.

NCR Process — 5 Steps
1

Apply Before Installing

SCE approval required before equipment purchase. We submit via sce.com/chargeready.

2

SCE Reviews & Approves

SCE confirms property eligibility, CALGreen status, and funding. We handle follow-up.

3

Coal Pods Installs

APL-approved networked L2 chargers with permits, city inspection, and TOU metering.

4

Submit Incentive Package

We compile invoices, permits, site plans, serial numbers, COO, and W9 for your claim.

5

SCE Issues Rebate Check

After verification, SCE sends your check. Enroll in TOU rate plan and demand response.

SCE Charge Ready — Commercial & Public Sector

For Businesses,
Offices & Government

SCE's Charge Ready program extends well beyond multi-family housing. Commercial properties, public sector facilities, and retail locations all qualify — including the high-value DC Fast Charging program with rebates up to $40,200 per port. Applications accepted through June 30, 2026 or until funds are exhausted.

APPLICATION DEADLINE: JUNE 30, 2026

SCE Charge Ready applications accepted through June 30, 2026, or until all funds are allocated. Agreements must be fully signed by December 31, 2026. Funding is limited — act now.

Check My Eligibility →
L2 + Infrastructure
🏗️
CHARGING INFRASTRUCTURE & REBATE
For multi-family, commercial, and public sector sites needing both infrastructure upgrades and Level 2 equipment. SCE provides no- or low-cost infrastructure plus an equipment rebate. Best for sites with significant electrical work needed.
Infra Funded
no/low-cost infra + equipment rebate
Multi-FamilyCommercialPublic Sector
Simple & Fast
🅿️
SMALL SITE REBATE
The most accessible Charge Ready track. Streamlined application with a direct rebate to offset purchase and installation of approved Level 2 chargers. Available to multi-family, commercial, and public sector properties of all sizes.
Direct Rebate
on L2 equipment purchase & installation
Multi-FamilyCommercialPublic Sector
DCFC Program Deep Dive

DC Fast Charging:
The Competitive Edge

DCFC (Level 3) chargers deliver 50–350+ kW, bringing an EV to 80% charge in 20–30 minutes. SCE's DCFC program targets publicly accessible short-dwell locations — retail, convenience stores, hotels, and highway corridors.

SCE covers full utility-side infrastructure. Customer-side costs are offset by the rebate, which varies based on Disadvantaged Community (DAC) status and Fortune 1000 classification.

$40,200
Max Rebate / Port
DAC sites & non-Fortune 1000 companies (highest tier)
2 Min
DCFC Stations Required
Minimum 2 SCE APL-approved DCFC chargers per site
10 Yrs
Operation Commitment
Own, operate, and maintain in working order
2027
Build Deadline
All customer-side construction must be complete by 2027
DCFC Requirements
Application approved by SCE before any infrastructure work begins
Minimum 2 SCE APL-approved DCFC stations per site
At least one CCS and one CHAdeMO or NACS connector per station
All customer-side installation by our SCE-compliant licensed electrical crew
Stations must be publicly accessible at short-dwell-time locations
Enroll in qualified demand response program (e.g. ELRP)
Contract with SCE Approved Network Provider for data reporting
SCE covers full utility-side infrastructure at no cost to you

Coal Pods advantage: SCE's rebate covers up to 80% of your total customer-side infrastructure project cost. We assess your site, file the SCE application, and manage installation from start to rebate check — so you keep more money in your pocket.

Which Program Fits Your Property?
Property / Criteria Charging Infra & Rebate New Construction Rebate Small Site Rebate DCFC Rebate
Multi-Family Property
Commercial Property
Public Sector / Government
New Construction Only
Publicly Accessible Required
Level 2 Equipment
DC Fast Charging (DCFC)
SCE Covers Utility-Side Infra
Covers Up to 80% of Infra Cost
Max Rebate Per PortInfra fundedUp to $3,500Direct rebateUp to $40,200
Property Types That Qualify

🏢 Commercial

  • Office buildings & campuses
  • Retail & shopping centers
  • Restaurants & hospitality
  • Industrial & warehouses
  • Agriculture & water
  • Light-duty fleets
→ DCFC & Small Site Rebate

🏛️ Public Sector

  • City & county facilities
  • School districts
  • Universities & colleges
  • Public parking lots
  • Municipal fleet yards
  • Government buildings
→ All 4 program tracks available

🏠 Multi-Family

  • Apartment buildings (2+ units)
  • Condominiums & HOAs
  • Retirement communities
  • Mobile home parks
  • University & military housing
  • Timeshare communities
→ NCR, Small Site, Infra & Turn-Key
Real SCE Charge Ready Results

It Works. Here's the Proof.

Real projects completed through the SCE Charge Ready program — the same one we navigate for our clients every day.

Commercial · DCFC
CNT Properties — Koreatown Retail
A Koreatown retail property installed four EV DC Fast Charging stations through SCE Charge Ready. Property Manager Charles Lee credited the move with increasing competitive edge by attracting EV-driving shoppers who stay longer.
4
DCFC stations
installed
Commercial · Level 2
Panda Restaurant Group — Rosemead HQ
Panda Express's Rosemead corporate campus deployed 60 Level 2 EV charging ports for employees through Charge Ready — a major workplace amenity supporting sustainability goals and recruiting EV-driving talent.
60
Level 2 ports
at headquarters
Public Sector · Fleet
LA County Sanitation Districts
LACSD, serving waste management for 5+ million people, installed 44 EV charging ports for their fleet through SCE Charge Ready — a critical step in electrifying public sector operations across LA County.
44
fleet ports
installed
Multi-Family · HOA
Silver Spur Court Condos — Rolling Hills Estates
This 18-unit HOA in Rolling Hills Estates installed 27 Level 2 EV charging ports through the Charge Ready program. HOA president Robert Wills credited the project with meaningfully increasing property values.
27
L2 ports
18-unit HOA
EV charging stations at multi-family apartment complex
Multi-Family Complex
Commercial EV charging stations in parking garage
Parking Garage Deploy
DC Fast Charging DCFC station commercial
DCFC Fast Charger
EV charging installation for condo and HOA
Condo & HOA Install
Licensed electrician performing EV charger and panel upgrade installation
80%
Avg. Cost Covered by SCE
5-Year
Workmanship Warranty
Why Coal Pods

Local. Licensed.
Legit.

We're an LA general contracting company wiring homes and properties across the region — not a national platform subcontracting your job to the lowest bidder.

01

SCE COVERS UP TO 80% OF YOUR COSTS

The Charging Infrastructure & Rebate program covers up to 80% of the estimated customer-side infrastructure project cost. We maximize your rebate by managing every step of the SCE application process.

02

PERMITS PULLED, EVERY TIME

Required for SCE rebate eligibility. Protects your insurance. Ensures code compliance. No gray area jobs — ever.

03

FULL SCE APPLICATION MANAGEMENT

We handle NCR, Charging Infrastructure, DCFC, and Small Site Rebate tracks. We know what SCE needs before you even ask.

04

5-YEAR WORKMANSHIP WARRANTY

We stand behind our work long after the permit closes. SCE requires 10-year equipment operation — we'll be there for any issues over that entire period.

How It Works

Four Steps to Charging

Transparent, fast, stress-free — whether it's a home charger or a commercial DCFC project.

01
FREE QUOTE
We assess your property, determine SCE rebate eligibility, and send a fixed-price quote within 48 hours.
02
SCE APPLICATION
We submit your SCE Charge Ready reservation before any equipment is ordered — required for all rebate tracks.
03
INSTALLATION DAY
Our licensed crew handles permits, SCE-approved equipment, wiring, metering, and a clean jobsite. Most residential jobs done same day.
04
REBATE & SIGN-OFF
We compile all SCE incentive docs, schedule final inspection, and walk you through your new system before we leave.
Multi-family apartment complex with EV charging installation
Multi-Family SCE Charge Ready
EV charger installation
Residential Level 2
DC Fast Charger DCFC installation
DCFC Level 3 Fast Charger
Customer Reviews

Real LA Customers.
Real Results.

★★★★★
4.9 out of 5 · 180+ Google Reviews
★★★★★

"Coal Pods handled our DCFC installation at our Culver City retail center — submitted the SCE rebate application, sourced approved Level 3 units, and managed everything start to finish. The rebate covered most of our project cost. Couldn't be happier."

TR
Tom R.
Culver City, CA · Retail Property Owner
★★★★★

"Three quotes and Coal Pods was the only contractor who knew the SCE NCR rebate and was qualified to file it. Installed 12 networked L2 ports across our Encino HOA garage — rebate covered most of the cost. No stress from start to finish."

JT
James T.
Encino, CA · HOA Manager
★★★★★

"New construction in Sherman Oaks — 48 units. Coal Pods handled the entire NCR application, sourced APL equipment, filed every document. Our rebate check came through without a single issue. Couldn't have done it without them."

SP
Sarah P.
Sherman Oaks, CA · Developer
Ready to Go Electric?

GET YOUR FREE
INSTALL QUOTE

30 seconds. No pressure. We'll assess your SCE rebate eligibility — L2 up to $3,500/port, DCFC up to $40,200/port.

📍 Greater LA · San Fernando Valley · Westside · South Bay · Inland Empire

⚡ Free Quote — Up to $40,200 SCE Rebates